Daily chemistry and brushing through the first week, then a 28-day schedule that sets the plaster right. Call before the fill.
Service starting at $37.50/weekabove-ground spa maintenance · pool service quoted by pool size
Tap to call · we pick up(760) 330-4465If we ever skip a scheduled stop, that visit is free.
Name, mobile, and the pool address. Tell us the fill date and we'll call you back with a quote.
Fresh plaster is soft. For about a month after the fill, it's releasing calcium into the water and setting up, and what happens to the chemistry in that window decides whether the surface stays smooth and even or comes out mottled, streaked, and scaled before the first summer. A startup is the maintenance work that gets it through that window right. Once your builder or plasterer hands you a full pool, we take it from there.
Day one we test everything, including the fill water — and in North County that matters, because Vallecitos and most inland tap water is already hard and high in alkalinity before it touches the plaster. We bring pH and alkalinity down to where the plaster wants them, add sequestrant to hold metals off the surface, and brush. Then we're back every day for the first week: test, adjust, brush the whole pool twice, and keep the pump running around the clock so the plaster dust stays in suspension and goes to the filter instead of settling into the finish.
Visits drop to every other day, then twice a week, as the water settles. We keep the filter cleaned through this stretch because plaster dust loads it fast. Calcium hardness climbs on its own as the plaster cures — we let it come up to range without adding any. We hold off on salt and on the heater until the surface has set, because both are hard on green plaster. Stabilizer goes in gradually once the chemistry is stable. Around day 28 the pool gets its first proper balance, the salt system gets started if you have one, and we walk you through what the pool needs from here.
Most people roll straight onto weekly service, which is the easiest way to protect a new surface. The water stays where the plaster wants it, and the equipment gets read every week while it's still under warranty. If you'd rather take it on yourself, we'll leave you with the numbers and a schedule.
We do startups on plaster, quartz, and pebble finishes across Vista, Oceanside, Carlsbad, San Marcos, Escondido, Fallbrook, Bonsall, and Rancho Santa Fe. Call as soon as you know the fill date so we can be there for day one.
A traditional startup, the way the plaster industry's own procedure lays it out: no chlorine for the first two days, brushing twice a day, the pump running around the clock, chemistry brought up in order. This is the schedule we work to and the log your plasterer gets.
| When | Our visits | Water | Equipment | You |
|---|---|---|---|---|
| Fill day | On site when the water reaches the tile line | Fill water tested; alkalinity and pH brought down to where plaster wants them; sequestrant in; no chlorine | Pump on and left on around the clock; heater off; salt off | Keep the hose running until we say full; nobody in the water |
| Days 2–3 | Daily | pH and alkalinity held; still no chlorine for the first 48 hours | Pump 24/7; filter pressure read | Brush the whole pool twice a day between our visits |
| Days 4–7 | Daily | Chlorine in, unstabilized, held low; pH and alkalinity held; dust coming out of the water | First filter clean when the dust loads it; heater stays off; salt stays off | Brush twice a day; no wheeled cleaner |
| Days 8–14 | Every other day | Calcium watched as it rises on its own; stabilizer started gradually once the chemistry is steady | Pump hours reduced to a long daily run; filter pressure logged | Brush daily; keep the level above the tile |
| Days 15–28 | Twice a week | Full balance brought into range; saturation index held where plaster neither scales nor etches | Second filter clean if the gauge calls for it; heater on once the dust is gone | Swim once we've told you the numbers are in range |
| Day 28 and after | Hand-off, or weekly service | First proper balance logged; the 28-day log emailed to you and your plasterer | Salt system started if you have one; robotic cleaner in | Decide: weekly service, or the numbers and a schedule |
Numbers shift a little by finish and by what your plasterer specifies; we follow the plasterer's sheet when there is one. What doesn't shift: daily attention in week one, brushing, and nothing on the surface stronger than balanced water.
Twenty to forty minutes, daily in week one. Same order every time; every number goes in the log.
pH, alkalinity, calcium hardness, and, once it's in, chlorine and stabilizer. Water temperature too — an August fill behaves differently from a January one. The reading decides the visit.
Alkalinity first, then pH, spread around the pool rather than poured in one spot. New plaster punishes a heavy hand: a concentrated dose settling on the floor is the pale patch that never goes away.
Walls, floor, steps, benches, the corners the returns don't reach. Brushed dust goes to the filter; dust that isn't becomes part of the finish. In week one we brush at the visit and you brush again that evening.
Plaster dust loads a cartridge in days. We read the pressure every visit and clean the filter the first time in week one on most pools, and again before hand-off if the gauge says so. If the pump won't hold prime or something on the pad isn't running the way the builder left it, that goes in writing the same day.
Every reading, every dose, a photo of the water, a note on how the surface looks. You get it after every visit; your plasterer or builder gets the same log if you want. Twenty-eight days of numbers is the paper trail a finish warranty asks for.
The industry procedure assumes fill water that's soft enough to bring calcium up to target. Ours arrives above it.
The standard startup targets calcium hardness in the 150-to-200 range by day 28, brought up deliberately. Inland tap water is some of the hardest in the county, so on a Vallecitos fill you can start at or above the target before the plaster adds its own. There's no taking it out, so the balance is held with pH and alkalinity instead. That's why a startup here needs someone testing daily, not a schedule off a sheet.
A summer fill inland means warm water from day one, which speeds up everything the chemistry is trying to slow down, and evaporation that concentrates calcium a little more each week. A Santa Ana in the first month drops grove dust onto a surface that's still soft. Those pools get brushed harder, and we'd rather fill in the cool months if the schedule allows.
Softer fill water is the good news. The bad news is a May-to-July fill under overcast: warm water, low light, and no chlorine for the first two days is exactly what algae wants, and a green tint on new plaster stains. We chlorinate on schedule, not early, and brush as if it's already there.
The procedure is the same shape for every finish, quartz included. What changes is how forgiving the surface is, and how long the dust lasts.
The least forgiving. It shows every mistake — mottling from high pH, streaks from a dose that settled, scale from calcium left alone. Daily attention in week one is not optional. Colored plaster shows it more.
The most forgiving surface and the dustiest startup. Pebble finishes shed cement for weeks, load the filter fastest, and want the most brushing. Two filter cleans in the first month is normal.
A fresh finish on a twenty-year-old pool is a new pool — same 28 days. Fresh water on cured plaster after a drain or RO treatment is a shorter version: the water still starts from zero and wants calcium and alkalinity brought up in order, not all at once.
Your plasterer finishes in the afternoon and the hose goes in. We're there when the water reaches the tile line. From then on the finish is chemistry, and chemistry is us.
We work for you or with your plasterer, whichever you'd like — some plasterers hand us their startup sheet and want the daily log; some builders want to know only if something's wrong. Either way the readings go out after every visit, and at day 28 you have a complete record. If your builder or plasterer wants to talk to us before the fill, give them the number.
What we don't do on a new pool: commission equipment, set up automation, or touch anything the electrician or builder wired. We run the system the way it was left and tell you in writing if it isn't running right — a pump that won't hold prime on fill day, a return that isn't flowing, a heater that comes on when it shouldn't. Most of that is a builder's warranty call, and the written note is what gets it handled.
Anything involving parts, wiring, plumbing, or the surface itself goes to our referral partner, Pool-Clinic Inc., a licensed C-53 swimming pool contractor, CSLB #1122305. You contract with them directly and pay them directly. We take nothing.
Because we don't earn on the fix, the note has no reason to say anything but what we saw.
Straight answers. If yours isn't here, call with the fill date and ask.
Daily visits for the first week, every other day in week two, and twice a week through day 28 — usually fourteen to sixteen visits. Each is a full test, adjustments in small doses, brushing, a read of the filter and pump, and the log emailed to you. Startup chemicals and the first filter clean are included. Quoted flat on the phone from the pool's size and finish.
Both. The intensive part is the first week, when the plaster is softest and the dust is heaviest — that's daily visits and twice-daily brushing. But the cement keeps curing for about a month, and calcium keeps coming out of the surface the whole time, so the program runs through day 28 at a lower frequency. Stopping after a week is how pools scale in week three.
Once the chemistry is balanced and we've told you so — usually in the second or third week, once the dust has cleared and chlorine is at normal levels. Swimming earlier mostly stirs up dust. We'll put it in the email the day it's fine.
The salt system waits until day 28 at the earliest, and some plasterers ask for six weeks — salt is hard on plaster that hasn't cured. The heater stays off until the plaster dust is gone, usually the second week; warm water speeds up scaling on a soft surface. Wheeled and robotic cleaners stay out for the full 28 days so they don't grind dust into the finish or mark it.
Yes. New plaster on a twenty-year-old pool is new plaster — the same 28-day cure, the same dust, the same sensitivity to pH and calcium. The equipment you already know, which makes it simpler, but the surface doesn't care how old the pump is. Call as soon as your plasterer gives you the fill date.
Most plaster warranties expect the industry startup procedure to have been followed, and some ask for proof. The daily log is that proof: twenty-eight days of readings and doses, dated, with photos, emailed to you and your plasterer if you like. We follow the plasterer's startup sheet when there is one, and the standard procedure when there isn't.
Either. Some builders hand us the pool at the fill and want the log; some homeowners hire us directly and we coordinate the date with the plasterer. What we flag in writing — a pump that won't prime, a return not flowing, anything on the surface that doesn't look right — goes to whoever's responsible: the builder under warranty, or Pool-Clinic Inc., a licensed C-53 swimming pool contractor, CSLB #1122305, whom you deal with directly. We take nothing on it.
Call now so we can be there on day one.
Service starting at $37.50/weekabove-ground spa maintenance · pool service quoted by pool size
Call nowCamp Pendleton is our backyard, and we know what shift work does to a pool. Two months of weekly service on us. PCS orders? We pause or cancel, no fee.
Service starting at $37.50/weekabove-ground spa maintenance · pool service quoted by pool size
Claim it — call now